Shearer Tanks: Solutions from the Ground Up
HomeProducts and ApplicationsProject ProfilesAbout UsRequest a QuoteContact Us
 
 
tank construction
Domes, Colors & Accessories

Engineering Standards

 
 
 
 
Tank construction
Solutions from the Ground Up

Shearer Tanks combines experience and technology to deliver your exact project specifications. We offer:

• Experienced, factory certified tank installation teams

• Modular tank construction

• TQM – Total Quality Management for tank design and construction integrity—start to finish

• Specialized jacking system consistent with top-first tank construction to minimize working heights and improve job safety

Typical installation takes less than 8 weeks to complete. Construction begins with the foundation work taking into consideration seismic concerns, location of inlets and outlets etc.—everything that makes a difference when it comes to maintenance and service. We map out the actual tank erection (including overflow piping and inlet/outlet tank fittings) and accessory installation (ladders, manways, staircases, etc.). Seasoned project management on-site and at the corporate level maximize efficiency and minimize change orders.

 
Shearer Tank construction Shearer Tank construction Shearer Tank construction
 
engineering
construction
additional services
Determining
Tank Use
Site
Layout
Determining Appropriate
Roof Type
Sizing
of Tank
Site Prep to Minimize
Construction Problems
Engineering &
Estimating Of Roofs
Location to
Maximize Efficiency
Foundation
Work
Installation of Domes,
Cones, Roofs, etc.
Location
Siting
Tank
Construction
Complete Retrofitting &
Updating of Existing Tanks
Seismic
Considerations
Considerations to Make
Maintenance & Servicing Easy
Inspections of
Existing Tanks
Scheduling Installation of Ladders,
Manways & Staircases
Maintenance
Budgeting &
Estimating
Testing Seismic
Reviews
Timetable
for Installation
Job Review
& Sign Off
Quality
Assurance Program
Specification
Assistance
   
Value
Engineering